SKETCH NO.3 FOR NEW RLY BRIDGE
Launch Sequence showing Construction Stages
Description
The bridge is slid over temporary bearings by pulling it with cable attached to its rear end. A winch pulls the cable around a pulley attached to the permanent East Pier of the Bridge. Other forms are also possible such as a cable-stayed bridge.