The Log StoreThis is the outbuilding that was used to store logs and coal...and spiders! Did you know, David doesn't like spiders? | Inside ViewThis is inside the Log Store from the new kitchen to the utility doorway. Will have to find a pine door, strip it, clean it up and fit it. I think this is big enough for a loo, don't you think? |
|
 The door that now leads through to the kitchen. The new consumer box is now hidden behind this door, along with cabling and plumbing ready to be finished off. |  Careful and precise preparation required for the ceiling plate, for the studwork to fix onto. |
|
 The studwall is in. This will divide the utility with the downstairs toilet and cloakroom. |  Ceiling insulated, lights in. The external door is rotten, it lets in the wind and rain. Better get a new door. |
|
 Metal lath has now been attached to the clay lump for the lime plaster to adhere to. |  Electric cables and sockets are in. Are we ready to plaster? Have we finished the plumbing? No! |
|
 Almost finished, just some units and plumbing to be done! Oh, yes, we can't use the toilet yet, it's just sitting pretty! |  This view looks good, new door, reclaimed window... the units are on order and I need to paint the skirting boards and architrave! |
|
| |
|
| |
|
| |
|