 Monday 8th May Built a workbench in the garage - mainly thanks to a cheap worktop from Ikea. Also, got round to sorting out all the sttuff from the shed! |
|
 Tuesday 9th May Finished cabling and earthing all the pool equipment in the control cupboard. Ready for electric hook-up later this week (hopefully). |
|
 Wednesday 10th May Uncrated the pool panels and lifted them in to the pool room. Things are begining to take shape!! |
|
 Friday 12th May Plumbed water flow & return, hydraulic pipes and tube for air switch to front of pool. |
|
 Saturday 13th May Bolted side panels together & added insulation. |
|
 Sunday 14th May Finished bolting panels together, anchoring them to the floor and insulating them all round. |
|
| |