SpanglefishFriends of PROJECTO SEMEAR | sitemap | log in
This is a free Spanglefish 1 website.

BASIC NEEDS

On the CONSTRUCTION SIDE .. an amount similar to the target which was set for the 2009/10 appeal

1) The Slab at 2nd Floor ( A Slab rather than Tiles)

2)The possible 2nd Floor Extension

3) Steel Beam to support the ARCH to replace the wall in Dora's Current Flat to form the Chill Out Zone for the Older Kids

On MORE GENERAL ANNUAL Expenditure

a) Regular Costs for maintaining the KOMBIs...during July 3 bills were covered by the "EXCESS" Fund-raising

b) A Fund to ensure that the SNACKs for the Children can be met

c) A Fund to ensure that a CAMP can be organised Annually

d) A fund for DORA the Caretaker...currently supported by a couple in SCOTLAND with a one off Payment { but this will end before the end of 2010 }...essential that this worry is taken away

I am sure there are probably many more ..that I have not yet thought about

 

 

Click for MapSSPC - Property in Scotland
sitemap | cookie policy | privacy policy