Road Works in Middlesbrough
CO-ORDINATION OF ROAD WORKS IN MIDDLESBROUGH
WEEK COMENCING 14th JULY 2014
Dates are correct at time of printing; however works may be delayed or extended due to unforeseen circumstances or inclement weather conditions.
MAJOR WORKS/ EVENTS
A66 MIDDLESBROUGH – Maintenance Works (Sunday only)
Maintenance works are programmed on Sunday 20/07/14, with off-side lane closures in place on both eastbound and westbound carriageways, between Cargo Fleet Roundabout and Hartington Interchange. Off-side lane closures will be in place on slip roads at each interchange and near-side lane closure at roundabouts. (CW)
A174 PARKWAY – Overnight Closures (Westbound) – Carriageway Works
The A174 westbound carriageway will be closed overnight (08.00 pm to 06.00 am), between 06/07/14 and 18/07/14, from the A172 Stokesley Road Interchange to the B1365 Blue Bell Interchange. The closures are required to allow carriageway strengthening works by Autolink. Diversions will be signed via A172 Stokesley Road, Stainton Way and B1365 Hemlington Lane. (RF)
CORPORATION ROAD, TOWN CENTRE – Carriageway Resurfacing
Carriageway resurfacing works on the length of Corporation Road, between Albert Road and Elm Street was carried out on Sunday 06/07/14. Works to resurface the remaining section between Elm Street and Wilson Street is programmed to take place on Sunday 13/07/14. Temporary traffic management will be in operation. (TE)
PARK VALE ROAD – Temporary Road Closure
A temporary road closure will be in place from 14/07/14, to allow sewer connection works to a new development at the former Clairville Stadium. The closure will be in place for 2 weeks and diversions will be in operation using Park Road South, Marton Road and Clairville Road. (SB)
Page 1 of 6
LADGATE LANE, TOLLESBY – Trinity College Access Road
Construction works are continuing to provide an access road to Trinity Catholic College from Ladgate Lane, west of the junction with Saltersgill Avenue. Works will continue until late July 2014 and lane restrictions may be in place. (AH)
A19/A174 PARKWAY INTERCHANGE IMPROVEMENTS
Major works are currently underway to improve the A19/A174 Parkway Interchange.
The Highways Agency is leading on the delivery of the scheme, in partnership with Middlesbrough and Stockton-on-Tees Borough Councils, with works funded by the Department for Transport. Once complete, the scheme will increase the capacity of the junction and reduce delays.
The scheme comprises:
• Widening of the southern and western quadrants of the roundabout to three lanes;
• Widening of the eastbound carriageway of the A174 Parkway to three lanes between the A19 and Stainton Interchange (B1380 Low Lane); and
• Dualling of the A174 Parkway Extension between the A19 and the new roundabout serving Teesside Industrial Estate in Thornaby.
These works are due for completion by the end of 2014.
Narrow lanes have been introduced on the roundabout, the A174 Parkway (Eastbound) and the A174 Parkway Extension, and weekday off-peak lane closures are also in operation.
The A174 Parkway Extension will be closed between 8 pm and 6 am during the week commencing Monday 21 July 2014 to allow kerb removal works to be carried out safely. The sign-posted diversion route for eastbound traffic will be via Thornaby Road, Trenchard Avenue, Mitchell Avenue, A1130 Acklam Road and the A19. westbound traffic will be diverted via A174 Parkway (eastbound), B1380 Low Lane and A1044 Thornaby Road. Whilst every effort will be made to minimise disruption to the travelling public, minor delays are expected. (RF)
B1380 LOW LANE, BROOKFIELD – Junction Improvement
Works are continuing to widen the A174 Parkway eastbound exit slip road and construct a signalised crossroads on B1380 Low Lane, to service a new development. To allow these works to be carried out safely, the right turn from the slip road to Low Lane eastbound will be prohibited. Traffic will be diverted westbound on B1380 Low Lane, to circumnavigate the roundabout junction and return on B1380 Low Lane eastbound.
Works will continue until further notice. (SB/S.Binns)
PENRITH ROAD, BERWICK HILLS – Temporary Road Closure
A temporary road closure will be in place opposite no.74 (near junction of Mohan Court), commencing 21/07/14 for 10 days. Southdale Homes be carrying out drainage connection works to a development at that location. Diversions will be in operation however access will be maintained for residents up to the point of closure. (MM)
Page 2 of 6
FAIRFIELD ROAD, GROVE HILL – Drainage Works
A temporary road closure will be in place until October 2014, for re-development and drainage works at the above location. (SB)
THE VALE/ SYCAMORE ROAD/ BEECH GROVE ROAD, GROVE HILL – Linear Park
Works are nearing completion to construct a new public park, to include the naturalisation of sections of Marton West Beck and new footways. Sections of Sycamore Road and Beech Grove Road to the west of The Vale will be closed to all traffic until works have been completed and access will then be reinstated for pedestrians, cyclists and Emergency Service vehicles only. National Cycle Network Route 65, which runs parallel to Marton West Beck, has been diverted along The Vale until works are complete. The area will remain fenced off until late August to allow seeds to become established. (AH)
PUBLIC UTILITY WORKS
MARTON ROAD, EASTERSIDE – NWL Sewer Repairs
NWL have programmed sewer repairs to commence on Sunday 13/07/14, outside no.535 Marton Road, just prior to the junction with Broadwell Road. A lane closure will be in place on the northbound carriageway (into town centre) and works are expected to continue for 3 days. (GN)
THE AVENUE, NUNTHORPE – NGN Works - Temporary Road Closure
NGN works will commence on 14/07/14 on The Avenue, between the junctions with Guisborough Road and Cornwall Close. Works will continue in this area for 6 weeks, with some disruption to residents.
A temporary road closure will be in place on Sunday 20/07/14 for 2-3 days, on The Avenue from its junction with Guisborough Road to Marton Moor Road.
Temporary 2-way traffic signals will be in operation on Sunday 20/07/14 for one day only, at the junction of Guisborough Road and The Avenue. (GN)
NEWPORT AREA, VARIOUS LOCATIONS – NPG HV Cable Works
NPG works are continuing, to open cut 2km of HV cable from Outram Street to Forty Foot Road. Works are progressing along Marsh St, Riverside Park Rd and Forty Foot Rd.
Excavation works will commence on the section along North Road/ Metz Bridge approach, on the evening of Friday 11/07/14 until Sunday 13/07/14 and the following weekend, with temporary 3-way traffic signals in operation. (GN)
Page 3 of 6
VICTORIA ROAD/ WOODLANDS ROAD/ ABINGDON ROAD, TOWN CENTRE –
NGN Works
NGN has programmed gas main renewal works to commence on 14/07/14 in Woodlands Road and Abingdon Road. The works will continue at various locations in this area for 4 weeks, with some disruption to residents. (GN)
DIXONS BANK/ GUISBOROUGH ROAD/ BRASS CASTLE LANE JUNCTION, NUNTHORPE – BT Works
BT duct repairs will be carried out on Sunday 20/07/14 at the above location. Temporary multi-way traffic signals will be in operation throughout the day (manually controlled) and major delays are expected. (GN)
ALBERT ROAD/ BAKER STREET/ BEDFORD STREET – NPG Works
NPG works are continuing to replace electric cables in Albert Road (between the junction with Grange Road and Baker Street), in Bedford Street and Baker Street. Works will take place within the footway and will continue until August 2014, with parking restrictions in place. (GN)
STAPLEFORD ROAD, NETHERFIELDS – NGN Works
NGN will continue gas main renewal works until late July, on Stapleford Road and Sedgebrook Gardens. (GN)
TRIMDON AVENUE, ACKLAM – NGN Works - Various Locations
NGN works have been extended for a further 2-3 weeks, to renew gas mains in Trimdon Avenue, Stonedale Walk and Tindale Walk. Works will remain within the footpaths and there will be no disruption to traffic. (GN)
CUMBERLAND ROAD, LINTHORPE – NGN Works - Various Locations
Gas main renewal works will continue in Cumberland Road until mid-July 2014. (GN)
HEMLINGTON ROAD, STAINTON - NGN Works
NGN works are programmed to commence on 31/07/14, outside no.10. Works will continue for 1 week with temporary 2-way traffic signals in operation. (GN)
VALLEY ROAD, GROVE HILL – NGN Works
NGN has programmed gas main renewal works to commence on 01/08/14, between the junction with Park Road South and Eastbourne Road. The works will continue for 4 weeks and temporary 2-way traffic lights will be required, controlled manually during peak periods to minimise disruption to traffic flows. (GN)
Page 4 of 6
FOOTPATH/ VERGE WORKS
ALBERT ROAD, TOWN CENTRE – Temporary Footpath Closure
A temporary footpath closure will be in place until spring 2015 outside Cleveland Centre, to allow construction works to a new hotel to be carried out safely. (SB)
FAIRFIELD AVENUE, LINTHORPE
Footpath reconstruction works will continue until 18/07/14 (even side only). (AP)
B1365 STOKESLEY ROAD, HEMLINGTON
Footpath reconstruction works have commenced on Stokesley Road, between Hemlington Village Road and the crossing point at Ridgeway. (AP)
WILLIAMS AVENUE, LINTHORPE
Works have commenced to replace verges at the above location. (AP)
HARDWICK AVENUE/ BRITAIN AVENUE, ACKLAM
Footpath renewal schemes at the above locations are programmed to start during the week commencing 07/07/14. Works will continue until further notice. (AP)
PROPOSED WORKS/ FUTURE EVENTS
CLAIRVILLE ROAD – Temporary Road Closure
A temporary road closure will be in place from 28/07/14, to allow sewer construction works to a new development at the former Clairville Stadium. The closure will be in place for 3 weeks and diversions will be in operation using Marton Road, Park Road South and Park Vale Road. (SB)
GUISBOROUGH ROAD, NUNTHORPE – Temporary Road Closure
A temporary closure will be in place on Sunday 03/08/14, between the junction with Gypsy Lane and Cortland Road, to allow Redcar and Cleveland Council to update the existing pedestrian crossing. Local diversions will be in operation via A1043 Nunthorpe By-Pass, however access will be maintained for residents’ within the closure and for Emergency Services. (GN)
Page 5 of 6
A1032 (TEES) NEWPORT BRIDGE - TEMPORARY CLOSURE – Summer Repainting
Works to repaint Newport Bridge and the adjacent span across Cannon Street will be carried out between July and November 2014. For safety purposes, a full closure of A1032 (Tees) Newport Bridge Approach Road will be required between the A66 at Newport Roundabout and the A19 at Portrack Roundabout, whilst repainting works above the carriageway are carried out. This closure will commence on Monday 28 July and will continue until Monday 8 September 2014, when the road will reopen to traffic.
The primary diversion route will be via A19 Tees Viaduct/ A66 Northern Route and secondary diversion routes will also be in operation using alternative crossings of the River Tees. Access for pedestrians and cyclists will be maintained at all times during the closure and also to premises accessible only via A1032 (Tees) Newport Bridge Approach Road.
Work is continuing to finalise the temporary traffic management arrangements required when the closure is in place, including those for bus passengers. Although every effort will be made to reduce delays to a minimum, some disruption is inevitable given the duration of the closure and the high volume of traffic that uses Newport Bridge.
RESPECT OUR ROAD WORKERS
Road works are a place of work, and the people there deserve just as much respect as you would expect at work. When you are approaching road works:
Keep within the speed limit – it is there for your safety
Keep a safe distance – there could be queues in front
Get into the correct lane in good time – don’t keep switching
Observe all signs – they are there to help you
Be alert for works’ traffic leaving or entering the road works
Concentrate on the road ahead, not the road works
_______________________________________________________________________
You can view the Road Works Map on the Middlesbrough Council website
at www.middlesbrough.gov.uk and follow the links: Transport and Parking – Roadworks
Page 6 of 6
CO-ORDINATION OF ROAD WORKS IN MIDDLESBROUGH
WEEK COMMENCING 30th JUNE 2014
Dates are correct at time of printing; however works may be delayed or extended due to unforeseen circumstances or inclement weather conditions.
MAJOR WORKS/ EVENTS
A66 MIDDLESBROUGH – Maintenance Works (Sunday only)
Maintenance works are programmed on Sunday 06/07/14, with near-side lane closures in place on both eastbound and westbound carriageways, between Hartington Interchange and the A19. Off-side lane closures will be in place on exit/ entry slip roads at each Interchange and near-side lane closures at roundabouts. (CW)
CORPORATION ROAD, TOWN CENTRE – Carriageway Resurfacing
Carriageway resurfacing works are programmed to take place from James Cook House to the junction with Albert Road. The road surface will be planed on Sunday 29/06/14 and resurfaced during the evenings of Tuesday 01/07/14 and Wednesday 02/07/14. Traffic management will be in operation. (RF)
ALBERT ROAD, TOWN CENTRE – Carriageway Resurfacing
Works to resurface the “table top” pedestrian crossing on Albert Road adjacent to the Cleveland Centre will be carried out early Sunday 29/06/14. The existing block paving will be replaced with tarmac, thereby reducing the need for regular maintenance in the future.
Works will be carried out using temporary traffic management and the road will remain open to traffic throughout. Pedestrian access will be unaffected and access to bus stops. (RF)
CORPORATION ROAD, TOWN CENTRE – Carriageway Resurfacing
Works to plane off the existing road surface on the length of Corporation Road, between Albert Road and Wilson Street, will be carried out on Wednesday evening 02/07/14. Resurfacing of this section is currently programmed for early Sunday 06/07/14, although this date has yet to be confirmed. The works will be carried out using temporary traffic management and the road will remain open to traffic throughout. Pedestrian access will be unaffected and access to bus stops. (RF)
A19/A174 PARKWAY INTERCHANGE IMPROVEMENTS
Major works have commenced to improve the A19/A174 Parkway Interchange.
The Highways Agency is leading on the scheme, in partnership with Middlesbrough and Stockton-on-Tees Borough Councils, with works funded by the Department for Transport. The scheme will increase the capacity of the junction and reduce delays. Works comprise the following:
· Widening of the southern and western quadrants of the roundabout to three lanes;
· Widening of the eastbound carriageway of the A174 Parkway to three lanes between the A19 and Stainton Interchange (B1380 Low Lane); and
· Dualling of the A174 Parkway Extension between the A19 and the new roundabout serving Teesside Industrial Estate in Thornaby.
These works are expected to be complete by the end of 2014 and although every effort will be made to minimise disruption to the travelling public, minor delays are expected. (RF)
B1380 LOW LANE, BROOKFIELD – Junction Improvement
Works are continuing to widen the A174 Parkway eastbound exit slip road and construct a signalised crossroads on B1380 Low Lane, to service a new development. To allow these works to be carried out safely, the right turn from the slip road to Low Lane eastbound will be prohibited. Traffic will be diverted westbound on B1380 Low Lane, to circumnavigate the roundabout junction and return on B1380 Low Lane eastbound.
Works will continue until further notice. (SB/S.Binns)
THE VALE/ SYCAMORE ROAD/ BEECH GROVE ROAD, GROVE HILL – Linear Park
Works will continue until July 2014 to construct a new public park, including the naturalisation of sections of Marton West Beck and new footways. Sections of Sycamore Road and Beech Grove Road to the west of The Vale will be closed to all traffic until construction works have been completed and access will then be reinstated for pedestrians, cyclists and Emergency Service vehicles only. National Cycle Network Route 65, which runs parallel to Marton West Beck and crosses both Sycamore Road and Beech Grove Road, will be diverted along The Vale while works are underway. (AH)
GRINKLE AVENUE, PARK END – Sewer Works
A temporary road closure will be in place from 30/06/14 for one week, to allow excavation works at the turning head, to create a sewer for a new development in the area. (SR)
LADGATE LANE, TOLLESBY – Trinity College Access Road
Construction works are continuing to provide an access road to Trinity Catholic College from Ladgate Lane, west of the junction with Saltersgill Avenue. Works will continue (mainly off-carriageway) until July 2014 and traffic flows should not be affected. (AH)
FAIRFIELD ROAD, GROVE HILL – Drainage Works
A temporary road closure will be in place until October 2014, for re-development and drainage works at the above location. (SB)
PUBLIC UTILITY WORKS
ALBERT ROAD/ BAKER STREET/ BEDFORD STREET, TOWN CENTRE –
NPG Works
NPG have commenced works to replace electric cables in Albert Road (between the junction with Grange Road and Baker Street), in Bedford Street and Baker Street. Works will take place within the footway and will continue until August 2014, with parking restrictions in place. (GN)
ALBERT ROAD/ WILSON STREET JUNCTION, TOWN CENTRE – NWL Works
NWL will carry out a permanent reinstatement at the above junction on Sunday 06/07/14, with temporary 4-way traffic signals in operation throughout the day. (GN)
GUNNERGATE LANE, MARTON – NWL Works
NWL works will commence on 03/07/14 and continue for 1 week, between St. Andrew’s Road and Stokesley Road. Temporary 2-way traffic signals in operation. (GN)
DIXONS BANK/ GUISBOROUGH ROAD/ BRASS CASTLE LANE JUNCTION, NUNTHORPE – BT Works
BT duct repairs have been re-scheduled and will now be carried out on Sunday 06/07/14 at the above location. Temporary multi-way traffic signals will be in operation throughout the day (manually controlled) and major delays are expected. (GN)
VALLEY ROAD, GROVE HILL – NGN Works
NGN has programmed gas main renewal works at the above location - date to be confirmed. The works will continue for 4 weeks, between the junction with Park Road South and Eastbourne Road. Temporary 2-way traffic lights will be required, controlled manually during peak periods to minimise disruption to traffic flows. (GN)
STAPLEFORD ROAD, NETHERFIELDS – NGN Works
NGN will continue gas main renewal works until late July, on Stapleford Road and Sedgebrook Gardens. (GN)
VICTORIA ROAD, TOWN CENTRE – NGN Works - Various Locations
NGN has programmed gas main renewal works to commence mid-July (dates to be confirmed). The works will continue for 4 weeks with some disruption to residents. (GN)
DERWENT STREET, NEWPORT – NPG Works – Various Locations
NPG have commenced works to replace electric cables in Lees Road. Works will continue into Teare Close, Gough Close, Carey Close and Derwent Street. Completion is expected in mid-July. (GN)
TRIMDON AVENUE, ACKLAM – NGN Works - Various Locations
NGN will continue works until the end of June, to renew gas mains in Trimdon Avenue, Stonedale Walk and Tindale Walk. Works will remain within the footpaths and there will be no disruption to traffic. (GN)
NEWPORT AREA, VARIOUS LOCATIONS – NPG HV Cable Works
NPG works will continue until July 2014, to open cut 2km of HV cable from Outram Street to Forty Foot Road. Works are progressing along Newport Rd to Marsh St, then along Riverside Park Rd and Forty Foot Rd. (GN)
CUMBERLAND ROAD, LINTHORPE – NGN Works - Various Locations
Gas main renewal works will continue in Cumberland Road until mid-July 2014. (GN)
FOOTPATH/ VERGE WORKS
ALBERT ROAD, TOWN CENTRE – Temporary Footpath Closure
A temporary footpath closure will be in place until spring 2015 outside Cleveland Centre, to allow construction works to a new hotel to be carried out safely. (SB)
FAIRFIELD AVENUE, LINTHORPE
Footpath reconstruction works will continue until further notice (even side only). (AP)
WESTERDALE ROAD, BERWICK HILLS
Works will continue until further notice to Tarmac verges at the above location. (AP)
HARTER CLOSE, NUNTHORPE
Works will begin during the week commencing 23/06/14, to scarify and resurface the footpath. (AP)
B1365 STOKESLEY ROAD, HEMLINGTON
Footpath reconstruction works are due to commence on Stokesley Road, between Hemlington Village Road and the crossing point at Ridgeway. (AP)
PROPOSED WORKS/ FUTURE EVENTS
HEMLINGTON ROAD, STAINTON - NGN Works
NGN works are programmed to commence on 31/07/14, outside no.10. Works will continue for 1 week with temporary 2-way traffic signals in operation. (GN)
GUISBOROUGH ROAD, NUNTHORPE – Temporary Road Closure
A temporary closure will be in place on Sunday 03/08/14, between the junction with Gypsy Lane and Cortland Road, to allow Redcar and Cleveland Council to update the existing pedestrian crossing. Local diversions will be in operation via A1043 Nunthorpe By-Pass, however access will be maintained for residents’ within the closure and for Emergency Services. (GN)
A1032 (TEES) NEWPORT BRIDGE - TEMPORARY CLOSURE – Summer Repainting
Works to repaint Newport Bridge and the adjacent span across Cannon Street will take place between 21/07/14 and 01/09/14. For safety purposes, a full closure of A1032 (Tees) Newport Bridge will be required, between the A66 at Newport Roundabout and the A19 at Portrack Roundabout.
The primary diversion route will be via A19 Tees Viaduct/ A66 Northern Route and secondary diversion routes will also be in operation using alternative crossings of the River Tees. Access for pedestrians and cyclists will be maintained at all times during the closure and also to premises accessible only via A1032 (Tees) Newport Bridge Approach Road.
Work is continuing to finalise the temporary traffic management arrangements required when the closure is in place, including those for bus passengers. Although every effort will be made to reduce delays to a minimum, some disruption is inevitable given the duration of the closure and the high volume of traffic that uses Newport Bridge.
Stockton-on-Tees Borough Council is leading on the delivery of the scheme, which has been developed in partnership with Middlesbrough Council, the Highways Agency, Autolink Concessionaires (A19) Ltd., Cleveland Police, Connect Tees Valley and the Bus Operators. (RF)
RESPECT OUR ROAD WORKERS
Road works are a place of work, and the people there deserve just as much respect as you would expect at work. When you are approaching road works:
· Keep within the speed limit – it is there for your safety
· Keep a safe distance – there could be queues in front
· Get into the correct lane in good time – don’t keep switching
· Observe all signs – they are there to help you
· Be alert for works’ traffic leaving or entering the road works
· Concentrate on the road ahead, not the road works
·
_______________________________________________________________________
You can view the Road Works Map on the Middlesbrough Council website
at www.middlesbrough.gov.uk and follow the links: Transport and Parking – Roadworks