This afternoon we started digging the trench, first of all we had to clear it, which meant we had to take out all the moss. We were looking for changes in the earth pattern, and changes on the section which was already there. The trench is just over 16m long, and it's 1m wide. We went and worked on another trench. We were clearing out a section of it which was getting rather crumbly. Then we measured the depth and length of that section. Then we were recording the stones and slopes of the main trench, and drawing it on a chart. We also took photos using a photo pole, and we had to experiment a lot with it. 


Add your comment

Your Name


Your Email (only if you are happy to have it on the site)


Your Comment - no HTML or weblinks


Enter this number in the box below and click Send - why?Unfortunately we have to do this to prevent the system being swamped by automated spam

 
Please note that whenever you submit something which may be publicly shown on a website you should take care not to make any statements which could be considered defamatory to any person or organisation.
Click for Map
sitemap | cookie policy | privacy policy | accessibility statement