Buildings
1. Over-loaded beam.
It was a two-storey office building; the first floor was of beam-and-slab concrete. One of the beams showed a vertical crack in the middle.
Upstairs was a wall-to-wall row of filing cabinets over that one beam.
It was suggested that they spread the load.