KITCHEN REFURBISHMENT
This project has now been completed, after approximately 430 man hours. We did find a few problems during the refurbishment, but we managed to resolve them.
The work was largely carried out by Trevor Mele, ably assisted by Terry Peear and David Cropley, to whom the committee express their grateful thanks.
BeforeThe kitchen before work started on 3rd December 2011 | AfterThe new kitchen completed on 14th February 2012 | | BeforeThe bar area before work started on 3rd December 2011 | AfterThe bar area completed on 14th February 2012. The old bar has been completely removed. | | View of KichenShowing the new window, cooker and sink unit. | Bar areaNew carpet tiles laid to complete the work. | | | | |
The committee wish to acknowledge the work carried out by the following:-
P A P Barford Joinery (for manufacturing the swing door, and sundry joinery work)
Tim Cunnington (for fitting the new kitchen and roller shutter)
Paul & Linda Roberts (for making the kitchen units)
Mike Dunn (for carrying out the electrical work)
Julian Smith (for carrying out the plumbing work)
All Seasons (for supplying and fitting the new windows; and Lee for carrying out the work)
Andy Stephenson of Alan Parker Flooring (for laying the new safety floor)
Site Last Updated - 17/03/2015 23:38:52 |