09 November 2011
MILL POND
The Mill Pond at Easthampstead was built as a Balancing Pond. It acts as an urban drainage system used to control flooding by temporarily storing flood waters. In open countryside, heavy rainfall soaks into the ground and is released relatively slowly into watercourses (ditches, streams, rivers). In an urban area, the extent of hard surfaces (roofs, roads) means that the rainfall is dumped immediately into the drainage system. If left unchecked, this will cause widespread flooding downstream. The function of a balancing lake is to contain this surge and release it slowly. Failure to do this, especially in older settlements without separate storm and foul sewers, can cause serious pollution as well as flooding.